The last segment of the Cairo Metro Line 3 (3C) is scheduled for experimental operation in October ahead of inauguration during the first half of 2024.
The new phase includes 6 new stations( Sudan – Imbaba – Al-Buhi – Arab nationalism – the ring road – Rod Al-Farag axis).
The third phase of the project, with a length of 17.7 km and includes 15 stations from Ataba station to Kit Kat Square